Situated on a brownfield site just outside Bath, the £23M bespoke headquarters building overlooks an area of outstanding natural beauty. It incorporates a host of environmental features such as greywater recycling and passive climate control.
Placing sustainability at the heart of the design concept provided impetus for fresh thinking and approaches to the problem of finely-detailed exposed structure.
The office spaces have been designed to facilitate natural cross-ventilation and passive cooling. They feature a soffit formed of exposed sculpted precast concrete coffer units on slender steel beams. The exposed structure provides thermal mass to control temperatures within the spaces. A subtly curved rib is a feature of each coffer, providing strength as well as increasing the surface area available for heat exchange.
The steel frame has enabled a very light appearance. Only the bottom flanges of the secondary beams are visible, as slender dove-grey strips supporting the precast coffer units.
To express the lightness of the structure through the façade, a study was performed with the architect to establish the optimum column spacings.
Whilst the central columns are at 6m centres along each wing, reducing the edge column centres to 3m (one for every secondary beam) meant that the edge beam functions purely as a tie. A small PFC section sits below the edge coffer unit, framing the BMS-operated high-level windows which provide night-time cooling. The shape of the coffer is expressed externally through the glazing.
The primary "spine" beam was designed as a box-section, perforated to maintain the flow of natural cross-ventilation below the soffit.
The internal faces of the spine beam can be seen from the office space. It was decided to fabricate the beam from a pair of PFCs toe-to-toe, to allow shop application of paint to these faces.
Particular attention has been paid to the detailing of exposed steelwork connections. Machined pins are used to provide interest where the spine-beam-to-column connection is expressed.
It was recommended that the steelwork, precast units and painting to both should be procured as one package, under the leadership of a steelwork contractor.
Fire engineering studies carried out by Buro Happold FEDRA demonstrated that the secondary beams did not require applied fire protection, and that only the external faces of the primary beams required intumescent paint.
Whilst undoubtedly not the cheapest structural solution in capital cost terms (steel, precast floors and topping, painting and erection together cost around £220/m² in a typical bay), the system offered numerous holistic cost and environmental advantages:
Carefully engineered modular design, creating a high quality office environment with a simple, but well crafted, frame solution. Thermal mass of this steel-framed structure is successfully utilised for internal climate control. A significant step towards the development of fully integrated building design, with good environmental credentials.