• Contact us
  • Steel Construction Certification Scheme
  • Members Area
  • Login

    Lost your password? Register
BCSA Master LogoBCSA Master LogoBCSA Master LogoBCSA Master Logo
  • About us
    • BCSA Group of Companies
    • Our Team
  • Member Directories
    • Buildings Directory
    • Bridgeworks Register
    • Industry
    • Corporate
    • Benefits of using a BCSA member
    • Sustainability Charter
      • Sustainability Charter Members
    • BIM Charter
      • BIM Charter Members
  • Join BCSA
    • Membership Categories
      • Steelwork Contractor Buildings
      • Steelwork Contractor Bridgeworks
      • Industry
      • Corporate
    • Member Benefits
  • Resources
    • COVID-19
    • Process and Technical
      • Bridges preliminary design
      • Coatings Advisory Service
      • Committees and Working Groups
      • National Structural Steelwork Specification
      • Steel Industry Guidance Notes (SIGNS)
      • Sustainability
        • SteelConstruction.info – Sustainability
        • Steel construction – Carbon Credentials
        • Sustainability Charter
        • Carbon Footprint Tool
        • Bridges Carbon Calculator
      • Steel Construction Building Information Modelling (BIM) Charter
      • Webinars
    • Law and Contracts
      • Annotated Contracts
      • Contractual Handbook
      • Construction Act Amendments
      • Helplines and Other Schemes
      • Insurances
      • Model Letters and Other Documents
      • Minimum Standards of Contract
      • Sub-contract Terms and Conditions
    • Commercial
      • Cost information
      • Daywork rates survey results
      • Economic reports
      • Prices and Lead Times
      • Reverse VAT
      • State of Trade
    • Health and Safety
      • ‘Be Selfish Be Safe’ Information Sheets
      • Behavioural Based Safety
      • Construction Skills Setting Out Video
      • Electromagnetic Fields
      • Erection Guides
        • BCSA Guides
        • Metal Deck Health and Safety Guides
      • Health and Safety Information
      • Lifting Operations
      • Loading and Unloading Vehicles
      • Mobile Elevating Work Platforms (MEWPs)
      • Office, Factory and Site
      • Personal Protective Equipment (PPE)
      • Risk Assessments
      • Safe Site Handover Certificate
      • Safety Schemes in Procurement (SSIP)
      • About Tool Box Talks
        • Tool Box Talks
    • Training
      • CRAFT Certificate Introduction to Module Learning
      • CRAFT Structural Steelwork Fabricator Welder
      • CRAFT Metal Decking Installer
      • CRAFT Structural Steel Detailer
      • CRAFT Surface Treatment
      • Bolting Competency
      • Welding Competency
    • Steel for Life
    • Structural Steel Design Awards
      • Award
        • Tintagel Footbridge, Cornwall
        • 52 Lime Street, London
        • The Curragh Racecourse Redevelopment, Kildare
        • Bath Schools of Art and Design
        • A14 Cambridge to Huntingdon Improvement Scheme
        • Brunel Building, London
      • Commendation
        • Mary Elmes Bridge, Cork City
        • The Post Building, London
        • Centre Building, London School of Economics
        • Waterloo Station Roof Infill
        • One Bartholomew, Barts Square, London
        • The Standard Hotel, London
      • Merit
        • The Gravity Bar, Guinness Storehouse, Dublin
        • Scarborough Footbridge, York
      • National Finalists
        • One Bank Street, Canary Wharf
        • Barton Square, intu Trafford Centre, Manchester
        • Boeing GoldCare Aircraft Hangar, Gatwick Airport
        • The Balfour, Kirkwall, Orkney
        • National Infrastructure Laboratory, University of Southampton
        • The Wave, Coventry
        • Drake Circus The Barcode, Plymouth
        • Bridgewater Place Wind Amelioration Scheme, Leeds
      • Judges 2020
      • SSDA 2019
        • Award
          • Wimbledon No.1 Court
          • Taplow Riverside Footbridge
          • Coal Drops Yard, London
          • Tombola HQ, Sunderland
          • Tottenham Hotspur Football Club, New Stadium
        • Commendation
          • Battersea Arts Centre
          • Fen Court, London
          • Chiswick Park Footbridge
          • Ingenuity House, Birmingham
          • Neuron Pod, London
          • Royal Academy of Music, London
        • Merit
          • The Macallan Distillery
          • G W Annenberg Performing Arts Centre
          • Greatham Creek Seal Hide, Middlesbrough
          • Telford Central Footbridges
        • National Finalists
          • 160 Old Street, London
          • Aga Khan Centre, London
          • Ely Southern Bypass
          • Project Mint at The O2
          • Kettner’s Townhouse & Soho House Greek Street
  • Events and Meetings
  • News
  • Shop
  • Members Area
  • BREXIT
  • COVID-19
  • HS2 Collaboration Hub Webinar
0
  • Home
  • News
  • General
  • President’s Column (April 2018)

President’s Column (April 2018)

16th April 2018

The UK economy is bumping along, we have read about construction material costs rising across the board, tightening labour availability, and the latest Construction PMI shows subdued growth conditions.

So, what does 2018 and beyond hold for the structural steelwork sector?

Given these general conditions, the outlook is solid – as is the sector itself. In 2017 structural steelwork consumption in the sector was 894,000 tonnes. We did see an easing in consumption last year, but 2018, 2019 and 2020 are forecast for an increase of 1.4%, 2.5% and 2.2% respectively giving total structural steelwork consumption of 950,000 tonnes by 2020.

The largest sector for structural steelwork is industrial buildings, accounting for around 47% of structural steelwork consumption in the UK in 2017. This includes warehouses, factories, portal framed superstores, infrastructure buildings such as airports and stations, and cold stores. This sector saw massive growth in structural steelwork consumption between 2012 and 2016 – 30% by volume. In 2017 structural steelwork consumption in industrial buildings fell by just under 3% as the building boom is massive distribution centres eased, but demand is set to pick up again in 2018 and beyond, leading to further rises in structural steelwork consumption (+1.4%), 2019 (+0.2%) and 2020 (+0.9%).

Things will remain a bit softer in the offices sector, one renowned for economic cycles, especially in the London market. In terms of structural steelwork consumption, this sector accounted for a 13% share in 2017. Our analysis shows that there will be falls in the construction of office buildings in London in 2018 and 2019, only partially offset by solid growth in the construction of offices in regional cities. This will result in a reduction in structural steelwork consumption for the sector. However, a pickup is due in 2020.

HS2 will have a positive effect on structural steelwork consumption in both bridges and other rail structures from 2019 onwards, with 50% growth in consumption in the sector expected between 2017 and 2020.

I’m often asked about the capacity of the sector to manage increases in demand for structural steelwork; this becomes pertinent as we move back towards the 1 million tonnes mark of structural steelwork consumption. A recent study of the UK’s structural steelwork capacity showed that there was ample latent capacity in the sector to meet increased demand. As our member companies look forward many are investing in new automated machinery and equipment, as well as other technology to boost productivity.

 

British Constructional Steelwork Association
4 Whitehall Court, Westminster, London SW1A 2ES
email: postroom@steelconstruction.org | Tel: 020 7839 8566
BCSA logo Supporting the UK Steelwork Contractors for over a Century
© All Rights Reserved BCSA – The British Constructional Steelwork Association Ltd.

This website uses cookies to improve your user experience. To find out more about the cookies we use, see our privacy policy. I accept