• Contact us
  • Steel Construction Certification Scheme
  • Members Area
  • Login

    Lost your password? Register
BCSA Master LogoBCSA Master LogoBCSA Master LogoBCSA Master Logo
  • About us
    • BCSA Group of Companies
    • Our Team
  • Member Directories
    • Buildings Directory
    • Bridgeworks Register
    • Industry
    • Corporate
    • Benefits of using a BCSA member
    • Sustainability Charter
      • Sustainability Charter Members
    • BIM Charter
      • BIM Charter Members
  • Join BCSA
    • Membership Categories
      • Steelwork Contractor Buildings
      • Steelwork Contractor Bridgeworks
      • Industry
      • Corporate
    • Member Benefits
  • Resources
    • COVID-19
    • Process and Technical
      • Bridges preliminary design
      • Coatings Advisory Service
      • Committees and Working Groups
      • National Structural Steelwork Specification
      • Steel Industry Guidance Notes (SIGNS)
      • Sustainability
        • SteelConstruction.info – Sustainability
        • Steel construction – Carbon Credentials
        • Sustainability Charter
        • Carbon Footprint Tool
        • Bridges Carbon Calculator
      • Steel Construction Building Information Modelling (BIM) Charter
      • Webinars
    • Law and Contracts
      • Annotated Contracts
      • Contractual Handbook
      • Construction Act Amendments
      • Helplines and Other Schemes
      • Insurances
      • Model Letters and Other Documents
      • Minimum Standards of Contract
      • Sub-contract Terms and Conditions
    • Commercial
      • Cost information
      • Daywork rates survey results
      • Economic reports
      • IR35 Off-Payroll Working
      • Prices and Lead Times
      • Reverse VAT
      • State of Trade
    • Health and Safety
      • ‘Be Selfish Be Safe’ Information Sheets
      • Behavioural Based Safety
      • Construction Skills Setting Out Video
      • Electromagnetic Fields
      • Erection Guides
        • BCSA Guides
        • Metal Deck Health and Safety Guides
      • Health and Safety Information
      • Lifting Operations
      • Loading and Unloading Vehicles
      • Mobile Elevating Work Platforms (MEWPs)
      • Office, Factory and Site
      • Personal Protective Equipment (PPE)
      • Risk Assessments
      • Safe Site Handover Certificate
      • Safety Schemes in Procurement (SSIP)
      • About Tool Box Talks
        • Tool Box Talks
      • BCSA CHAS Discount offer
    • Training
      • CRAFT Certificate Introduction to Module Learning
      • CRAFT Structural Steelwork Fabricator Welder
      • CRAFT Metal Decking Installer
      • CRAFT Structural Steel Detailer
      • CRAFT Surface Treatment
      • Bolting Competency
      • Welding Competency
    • Steel for Life
    • Structural Steel Design Awards
      • Award
        • Tintagel Footbridge, Cornwall
        • 52 Lime Street, London
        • The Curragh Racecourse Redevelopment, Kildare
        • Bath Schools of Art and Design
        • A14 Cambridge to Huntingdon Improvement Scheme
        • Brunel Building, London
      • Commendation
        • Mary Elmes Bridge, Cork City
        • The Post Building, London
        • Centre Building, London School of Economics
        • Waterloo Station Roof Infill
        • One Bartholomew, Barts Square, London
        • The Standard Hotel, London
      • Merit
        • The Gravity Bar, Guinness Storehouse, Dublin
        • Scarborough Footbridge, York
      • National Finalists
        • One Bank Street, Canary Wharf
        • Barton Square, intu Trafford Centre, Manchester
        • Boeing GoldCare Aircraft Hangar, Gatwick Airport
        • The Balfour, Kirkwall, Orkney
        • National Infrastructure Laboratory, University of Southampton
        • The Wave, Coventry
        • Drake Circus The Barcode, Plymouth
        • Bridgewater Place Wind Amelioration Scheme, Leeds
      • Judges 2020
      • SSDA 2019
        • Award
          • Wimbledon No.1 Court
          • Taplow Riverside Footbridge
          • Coal Drops Yard, London
          • Tombola HQ, Sunderland
          • Tottenham Hotspur Football Club, New Stadium
        • Commendation
          • Battersea Arts Centre
          • Fen Court, London
          • Chiswick Park Footbridge
          • Ingenuity House, Birmingham
          • Neuron Pod, London
          • Royal Academy of Music, London
        • Merit
          • The Macallan Distillery
          • G W Annenberg Performing Arts Centre
          • Greatham Creek Seal Hide, Middlesbrough
          • Telford Central Footbridges
        • National Finalists
          • 160 Old Street, London
          • Aga Khan Centre, London
          • Ely Southern Bypass
          • Project Mint at The O2
          • Kettner’s Townhouse & Soho House Greek Street
  • Events and Meetings
  • News
  • Shop
  • Members Area
  • Reverse VAT
  • BREXIT
  • COVID-19
  • HS2 Collaboration Hub Webinar
0
  • Home
  • News
  • General
  • President’s Column (May 2018)

President’s Column (May 2018)

11th May 2018

I’ve learnt over the year that my view of the world isn’t shared by everyone else. And when we think about design, that is certainly the case.

From an architect’s perspective, design can be seen as a bridge – one between a client’s vision and the actual form of the structure. When I have met with architects or heard them speak, they have often referred to design as both an art and a science. Then when the design is passed onto the engineer, mathematics, science and modelling dominate, and practical design issues such as buildability, cost and safety come to the fore.

Like engineers, steelwork contractors use modelling to ensure the safety, buildability and cost-effectiveness of the steel structure. But for us, design provides much more than this.

First and foremost, a good design process means a technically correct and complete model is handed over to the steelwork contractor. But all too often, information is missing, unclear and sometimes just plain wrong. So with the clock already ticking on the programme, the steelwork contractor spends time chasing up information or querying design issues, and is often put under pressure to start processing the steelwork before the design is finalised. Naturally, this can lead to costly rework and delays later on.

Why does this happen?

One reason is the 2008 recession, which hollowed out many mid-career engineers; those who would have provided support today for their younger, less experienced colleagues. This gap is now being filled with IStructE and others developing a range of training programmes for their members over the last few years.

The second reason is procurement. A good design process is reliant on an effective procurement process, and this remains a major issue on the construction sector. The design cannot be completed when key follow-on trades such as M&E and cladding contractors have not yet been contracted, so the consultant and steelwork contractor are forced to make assumptions that often need to be changed later on.

Willingness to pay for a proper design sometimes comes into it as well – who can blame consultants for only doing what they’re contracted to do?

BIM was touted as the answer to the problem of good and complete design. As we all know, steelwork contractors have enthusiastically adopted Level 2 BIM. However, to be fully effective, BIM as a process requires engagement of the various parts of the supply chain at the right time in the procurement process.

If the government is to improve efficiency and productivity, as it says it wants, it could start by looking at early engagement with the supply chain and finalisation of the design to drive a more effective design process.

British Constructional Steelwork Association
4 Whitehall Court, Westminster, London SW1A 2ES
email: postroom@steelconstruction.org | Tel: 020 7839 8566
BCSA logo Supporting the UK Steelwork Contractors for over a Century
© All Rights Reserved BCSA – The British Constructional Steelwork Association Ltd.

This website uses cookies to improve your user experience. To find out more about the cookies we use, see our privacy policy. I accept