• Contact us
  • Steel Construction Certification Scheme
  • Members Area
  • Login

    Lost your password? Register
BCSA Master LogoBCSA Master LogoBCSA Master LogoBCSA Master Logo
  • About us
    • BCSA Group of Companies
    • Our Team
  • Member Directories
    • Buildings Directory
    • Bridgeworks Register
    • Industry
    • Corporate
    • Benefits of using a BCSA member
    • Sustainability Charter
      • Sustainability Charter Members
    • BIM Charter
      • BIM Charter Members
  • Join BCSA
    • Membership Categories
      • Steelwork Contractor Buildings
      • Steelwork Contractor Bridgeworks
      • Industry
      • Corporate
    • Member Benefits
  • Resources
    • COVID-19
    • Process and Technical
      • Bridges preliminary design
      • Coatings Advisory Service
      • Committees and Working Groups
      • National Structural Steelwork Specification
      • Steel Industry Guidance Notes (SIGNS)
      • Sustainability
        • SteelConstruction.info – Sustainability
        • Steel construction – Carbon Credentials
        • Sustainability Charter
        • Carbon Footprint Tool
        • Bridges Carbon Calculator
      • Steel Construction Building Information Modelling (BIM) Charter
      • Webinars
    • Law and Contracts
      • Annotated Contracts
      • Contractual Handbook
      • Construction Act Amendments
      • Helplines and Other Schemes
      • Insurances
      • Model Letters and Other Documents
      • Minimum Standards of Contract
      • Sub-contract Terms and Conditions
    • Commercial
      • Cost information
      • Daywork rates survey results
      • Economic reports
      • Prices and Lead Times
      • Reverse VAT
      • State of Trade
    • Health and Safety
      • ‘Be Selfish Be Safe’ Information Sheets
      • Behavioural Based Safety
      • Construction Skills Setting Out Video
      • Electromagnetic Fields
      • Erection Guides
        • BCSA Guides
        • Metal Deck Health and Safety Guides
      • Health and Safety Information
      • Lifting Operations
      • Loading and Unloading Vehicles
      • Mobile Elevating Work Platforms (MEWPs)
      • Office, Factory and Site
      • Personal Protective Equipment (PPE)
      • Risk Assessments
      • Safe Site Handover Certificate
      • Safety Schemes in Procurement (SSIP)
      • About Tool Box Talks
        • Tool Box Talks
    • Training
      • CRAFT Certificate Introduction to Module Learning
      • CRAFT Structural Steelwork Fabricator Welder
      • CRAFT Metal Decking Installer
      • CRAFT Structural Steel Detailer
      • CRAFT Surface Treatment
      • Bolting Competency
      • Welding Competency
    • Steel for Life
    • Structural Steel Design Awards
      • Award
        • Tintagel Footbridge, Cornwall
        • 52 Lime Street, London
        • The Curragh Racecourse Redevelopment, Kildare
        • Bath Schools of Art and Design
        • A14 Cambridge to Huntingdon Improvement Scheme
        • Brunel Building, London
      • Commendation
        • Mary Elmes Bridge, Cork City
        • The Post Building, London
        • Centre Building, London School of Economics
        • Waterloo Station Roof Infill
        • One Bartholomew, Barts Square, London
        • The Standard Hotel, London
      • Merit
        • The Gravity Bar, Guinness Storehouse, Dublin
        • Scarborough Footbridge, York
      • National Finalists
        • One Bank Street, Canary Wharf
        • Barton Square, intu Trafford Centre, Manchester
        • Boeing GoldCare Aircraft Hangar, Gatwick Airport
        • The Balfour, Kirkwall, Orkney
        • National Infrastructure Laboratory, University of Southampton
        • The Wave, Coventry
        • Drake Circus The Barcode, Plymouth
        • Bridgewater Place Wind Amelioration Scheme, Leeds
      • Judges 2020
      • SSDA 2019
        • Award
          • Wimbledon No.1 Court
          • Taplow Riverside Footbridge
          • Coal Drops Yard, London
          • Tombola HQ, Sunderland
          • Tottenham Hotspur Football Club, New Stadium
        • Commendation
          • Battersea Arts Centre
          • Fen Court, London
          • Chiswick Park Footbridge
          • Ingenuity House, Birmingham
          • Neuron Pod, London
          • Royal Academy of Music, London
        • Merit
          • The Macallan Distillery
          • G W Annenberg Performing Arts Centre
          • Greatham Creek Seal Hide, Middlesbrough
          • Telford Central Footbridges
        • National Finalists
          • 160 Old Street, London
          • Aga Khan Centre, London
          • Ely Southern Bypass
          • Project Mint at The O2
          • Kettner’s Townhouse & Soho House Greek Street
  • Events and Meetings
  • News
  • Shop
  • Members Area
  • BREXIT
  • COVID-19
  • HS2 Collaboration Hub Webinar
0
  • Home
  • News
  • General
  • President’s Column (July 2019)

President’s Column (July 2019)

12th July 2019

I often use this column as a soapbox for issues facing the structural steelwork sector, who wouldn’t? But this month’s column is all about celebration. Celebration of the incredible industry that is structural steelwork. An industry that I’ve worked in for 15 years. When I’m walking around the City of London and look up to see one of the many great buildings I’ve worked on over the years, I feel a rush of pride as I tell myself , I helped create that. And happily for me, I’m able to travel the length and breadth of the UK and more often than not, I will come across one of ‘my’ projects.  Of course, these projects aren’t really mine. They belong to the whole team; from the client to the designers to the specialists who took a concept and made something out of it. They also belong to the people who live, work or play in that building or structure. Every time I cross the Forth, I look at those three beautiful bridges lined up one next to the other. The grandfather, the father and the son. I think of the people who designed them, who built them, and those who maintain them today. All of them servicing a need, and each of them a fantastic piece of engineering and construction in their own right. And they will all still be there, serving our community long after I’m gone. Of course, it would have been far better for UK Plc if the main span of the Queensferry Crossing had been made by a UK steelwork contractor,  see I really can’t keep off my soapbox, because UK steelwork contractors, and in particular, BCSA members, really are the best in the world.

BCSA members are pre-assessed across many different aspects. This means that clients and contractors can be assured they have the specialist experience and qualifications for the job.  Over time, BCSA has pushed faster compliance with new regulation, helped improve quality and health and safety in the sector and driven best practice among members. In turn, a better performing structural steelwork sector benefits clients and main contractors. BCSA members can also raise and address issues and problems of mutual interest that can only be solved by working together.  I see BCSA membership as a benchmark for professionalism and the can-do attitude BCSA members have.  I know that like me, future generations of BCSA members across the UK will also look up with pride to admire ‘their’ buildings.

British Constructional Steelwork Association
4 Whitehall Court, Westminster, London SW1A 2ES
email: postroom@steelconstruction.org | Tel: 020 7839 8566
BCSA logo Supporting the UK Steelwork Contractors for over a Century
© All Rights Reserved BCSA – The British Constructional Steelwork Association Ltd.

This website uses cookies to improve your user experience. To find out more about the cookies we use, see our privacy policy. I accept