• Contact us
  • Steel Construction Certification Scheme
  • Members Area
  • Login

    Lost your password? Register
BCSA Master LogoBCSA Master LogoBCSA Master LogoBCSA Master Logo
  • About us
    • BCSA Group of Companies
    • Our Team
  • Member Directories
    • Buildings Directory
    • Bridgeworks Register
    • Industry
    • Corporate
    • Benefits of using a BCSA member
    • Sustainability Charter
      • Sustainability Charter Members
    • BIM Charter
      • BIM Charter Members
  • Join BCSA
    • Membership Categories
      • Steelwork Contractor Buildings
      • Steelwork Contractor Bridgeworks
      • Industry
      • Corporate
    • Member Benefits
  • Resources
    • COVID-19
    • Process and Technical
      • Bridges preliminary design
      • Coatings Advisory Service
      • Committees and Working Groups
      • National Structural Steelwork Specification
      • Steel Industry Guidance Notes (SIGNS)
      • Sustainability
        • SteelConstruction.info – Sustainability
        • Steel construction – Carbon Credentials
        • Sustainability Charter
        • Carbon Footprint Tool
        • Bridges Carbon Calculator
      • Steel Construction Building Information Modelling (BIM) Charter
      • Webinars
    • Law and Contracts
      • Annotated Contracts
      • Contractual Handbook
      • Construction Act Amendments
      • Helplines and Other Schemes
      • Insurances
      • Model Letters and Other Documents
      • Minimum Standards of Contract
      • Sub-contract Terms and Conditions
    • Commercial
      • Cost information
      • Daywork rates survey results
      • Economic reports
      • IR35 Off-Payroll Working
      • Prices and Lead Times
      • Reverse VAT
      • State of Trade
    • Health and Safety
      • ‘Be Selfish Be Safe’ Information Sheets
      • Behavioural Based Safety
      • Construction Skills Setting Out Video
      • Electromagnetic Fields
      • Erection Guides
        • BCSA Guides
        • Metal Deck Health and Safety Guides
      • Health and Safety Information
      • Lifting Operations
      • Loading and Unloading Vehicles
      • Mobile Elevating Work Platforms (MEWPs)
      • Office, Factory and Site
      • Personal Protective Equipment (PPE)
      • Risk Assessments
      • Safe Site Handover Certificate
      • Safety Schemes in Procurement (SSIP)
      • About Tool Box Talks
        • Tool Box Talks
      • BCSA CHAS Discount offer
    • Training
      • CRAFT Certificate Introduction to Module Learning
      • CRAFT Structural Steelwork Fabricator Welder
      • CRAFT Metal Decking Installer
      • CRAFT Structural Steel Detailer
      • CRAFT Surface Treatment
      • Bolting Competency
      • Welding Competency
    • Steel for Life
    • Structural Steel Design Awards
      • Award
        • Tintagel Footbridge, Cornwall
        • 52 Lime Street, London
        • The Curragh Racecourse Redevelopment, Kildare
        • Bath Schools of Art and Design
        • A14 Cambridge to Huntingdon Improvement Scheme
        • Brunel Building, London
      • Commendation
        • Mary Elmes Bridge, Cork City
        • The Post Building, London
        • Centre Building, London School of Economics
        • Waterloo Station Roof Infill
        • One Bartholomew, Barts Square, London
        • The Standard Hotel, London
      • Merit
        • The Gravity Bar, Guinness Storehouse, Dublin
        • Scarborough Footbridge, York
      • National Finalists
        • One Bank Street, Canary Wharf
        • Barton Square, intu Trafford Centre, Manchester
        • Boeing GoldCare Aircraft Hangar, Gatwick Airport
        • The Balfour, Kirkwall, Orkney
        • National Infrastructure Laboratory, University of Southampton
        • The Wave, Coventry
        • Drake Circus The Barcode, Plymouth
        • Bridgewater Place Wind Amelioration Scheme, Leeds
      • Judges 2020
      • SSDA 2019
        • Award
          • Wimbledon No.1 Court
          • Taplow Riverside Footbridge
          • Coal Drops Yard, London
          • Tombola HQ, Sunderland
          • Tottenham Hotspur Football Club, New Stadium
        • Commendation
          • Battersea Arts Centre
          • Fen Court, London
          • Chiswick Park Footbridge
          • Ingenuity House, Birmingham
          • Neuron Pod, London
          • Royal Academy of Music, London
        • Merit
          • The Macallan Distillery
          • G W Annenberg Performing Arts Centre
          • Greatham Creek Seal Hide, Middlesbrough
          • Telford Central Footbridges
        • National Finalists
          • 160 Old Street, London
          • Aga Khan Centre, London
          • Ely Southern Bypass
          • Project Mint at The O2
          • Kettner’s Townhouse & Soho House Greek Street
  • Events and Meetings
  • News
  • Shop
  • Members Area
  • Reverse VAT
  • BREXIT
  • COVID-19
  • HS2 Collaboration Hub Webinar
0
  • Home
  • News
  • General
  • President’s Column (May 2020)

President’s Column (May 2020)

15th May 2020

We’re all acclimatising ourselves to new ways of working. For most steelwork contractors the restrictions have resulted in home working and social distancing in factories and offices, where being organised and planning work around the social distancing requirements is paramount. There were some mixed messages at the start of the lockdown, but this was a temporary measure to introduce better health and safety measures and the majority of sites in England and Wales are now open.

The social restrictions have now been in place for six weeks as thoughts focus on the future and the ‘new normal’. Most of us have taken to virtual meetings using ‘video conferencing’ and while for many this was a new way of communicating, the benefits of not having to travel long distances for short meetings are clear enough. As one CEO put it, “for a meeting in London I usual get up at 5.30am catch the 7.30am to London, hold a meeting from 10.30 until 15.30 and take the 17.30 train home. With video conferencing I don’t have to leave the office and I can have five meetings a day”. The benefits of virtual meetings are obvious and its highly likely that the new normal will involve less travelling and more virtual meetings. It’ll not be just the FD that likes that one, the dog gets an extra walk.

The industry is also looking forward and trying to gauge what the steelwork market will look like in Q3 and beyond. We may be concerned that clients could shelve projects during the lockdown and only proceed when the uncertainty is over. This will surely have an effect on the construction market in Q3 and Q4. This is why the BCSA wrote to the Rt Hon Alok Sharma MP, Secretary of State for Business, Energy and Industrial Strategy, urging him to encourage the public and private sectors not to suspend projects, but to continue with their schemes and, as a matter of urgency, progress with the infrastructure projects promised in the budget so that the work is brought on-stream later this year. I think this message was clear and I was very pleased to see HS2 recently get the green light. This is a sector that gets cash into the GDP very quickly, and that’s really important for everyone. Every pound spent in infrastructure could generate nearly three into the GDP.

BCSA has also been trying to estimate the effects of the lockdown on the market for constructional steelwork. Assuming that the lockdown is in place for between 6 and 8 weeks and that construction sites continue to implement the social distancing guidelines, the estimate is that the effect will be to reduce the market by 46% in Q2, 5.1% in Q3 and to gain 5.5% in Q4. They also estimate the market will grow by 7.8% in 2021. This is only one estimate and if correct would be one of the better outcomes.

The good news is that the constructional steelwork industry is in good shape. Supply chains are doing their best to service customers with the supply of steel stock, engineering, fabrication and materials right through the chain. I for one, have been really impressed by the can-do attitude of the industry, one that keeps everyone as safe and operational as can be.

Tim Outteridge, BCSA President

British Constructional Steelwork Association
4 Whitehall Court, Westminster, London SW1A 2ES
email: postroom@steelconstruction.org | Tel: 020 7839 8566
BCSA logo Supporting the UK Steelwork Contractors for over a Century
© All Rights Reserved BCSA – The British Constructional Steelwork Association Ltd.

This website uses cookies to improve your user experience. To find out more about the cookies we use, see our privacy policy. I accept