• Contact us
  • Steel Construction Certification Scheme
  • Members Area
  • Login

    Lost your password? Register
BCSA Master LogoBCSA Master LogoBCSA Master LogoBCSA Master Logo
  • About us
    • BCSA Group of Companies
    • Our Team
  • Member Directories
    • Buildings Directory
    • Bridgeworks Register
    • Industry
    • Corporate
    • Benefits of using a BCSA member
    • Sustainability Charter
      • Sustainability Charter Members
    • BIM Charter
      • BIM Charter Members
  • Join BCSA
    • Membership Categories
      • Steelwork Contractor Buildings
      • Steelwork Contractor Bridgeworks
      • Industry
      • Corporate
    • Member Benefits
  • Resources
    • COVID-19
    • Process and Technical
      • Bridges preliminary design
      • Coatings Advisory Service
      • Committees and Working Groups
      • National Structural Steelwork Specification
      • Steel Industry Guidance Notes (SIGNS)
      • Sustainability
        • SteelConstruction.info – Sustainability
        • Steel construction – Carbon Credentials
        • Sustainability Charter
        • Carbon Footprint Tool
        • Bridges Carbon Calculator
      • Steel Construction Building Information Modelling (BIM) Charter
      • Webinars
    • Law and Contracts
      • Annotated Contracts
      • Contractual Handbook
      • Construction Act Amendments
      • Helplines and Other Schemes
      • Insurances
      • Model Letters and Other Documents
      • Minimum Standards of Contract
      • Sub-contract Terms and Conditions
    • Commercial
      • Cost information
      • Daywork rates survey results
      • Economic reports
      • Prices and Lead Times
      • Reverse VAT
      • State of Trade
    • Health and Safety
      • ‘Be Selfish Be Safe’ Information Sheets
      • Behavioural Based Safety
      • Construction Skills Setting Out Video
      • Electromagnetic Fields
      • Erection Guides
        • BCSA Guides
        • Metal Deck Health and Safety Guides
      • Health and Safety Information
      • Lifting Operations
      • Loading and Unloading Vehicles
      • Mobile Elevating Work Platforms (MEWPs)
      • Office, Factory and Site
      • Personal Protective Equipment (PPE)
      • Risk Assessments
      • Safe Site Handover Certificate
      • Safety Schemes in Procurement (SSIP)
      • About Tool Box Talks
        • Tool Box Talks
      • BCSA CHAS Discount offer
    • Training
      • CRAFT Certificate Introduction to Module Learning
      • CRAFT Structural Steelwork Fabricator Welder
      • CRAFT Metal Decking Installer
      • CRAFT Structural Steel Detailer
      • CRAFT Surface Treatment
      • Bolting Competency
      • Welding Competency
    • Steel for Life
    • Structural Steel Design Awards
      • Award
        • Tintagel Footbridge, Cornwall
        • 52 Lime Street, London
        • The Curragh Racecourse Redevelopment, Kildare
        • Bath Schools of Art and Design
        • A14 Cambridge to Huntingdon Improvement Scheme
        • Brunel Building, London
      • Commendation
        • Mary Elmes Bridge, Cork City
        • The Post Building, London
        • Centre Building, London School of Economics
        • Waterloo Station Roof Infill
        • One Bartholomew, Barts Square, London
        • The Standard Hotel, London
      • Merit
        • The Gravity Bar, Guinness Storehouse, Dublin
        • Scarborough Footbridge, York
      • National Finalists
        • One Bank Street, Canary Wharf
        • Barton Square, intu Trafford Centre, Manchester
        • Boeing GoldCare Aircraft Hangar, Gatwick Airport
        • The Balfour, Kirkwall, Orkney
        • National Infrastructure Laboratory, University of Southampton
        • The Wave, Coventry
        • Drake Circus The Barcode, Plymouth
        • Bridgewater Place Wind Amelioration Scheme, Leeds
      • Judges 2020
      • SSDA 2019
        • Award
          • Wimbledon No.1 Court
          • Taplow Riverside Footbridge
          • Coal Drops Yard, London
          • Tombola HQ, Sunderland
          • Tottenham Hotspur Football Club, New Stadium
        • Commendation
          • Battersea Arts Centre
          • Fen Court, London
          • Chiswick Park Footbridge
          • Ingenuity House, Birmingham
          • Neuron Pod, London
          • Royal Academy of Music, London
        • Merit
          • The Macallan Distillery
          • G W Annenberg Performing Arts Centre
          • Greatham Creek Seal Hide, Middlesbrough
          • Telford Central Footbridges
        • National Finalists
          • 160 Old Street, London
          • Aga Khan Centre, London
          • Ely Southern Bypass
          • Project Mint at The O2
          • Kettner’s Townhouse & Soho House Greek Street
  • Events and Meetings
  • News
  • Shop
  • Members Area
  • BREXIT
  • COVID-19
  • HS2 Collaboration Hub Webinar
0
  • Home
  • News
  • General
  • President’s Column (June 2020)

President’s Column (June 2020)

12th June 2020

The lockdown is starting to be relaxed and although things won’t be back to normal any time soon, a lot of construction sites are open (with the exception of some in Scotland) and most steelwork contractors are working. We all look forward to more restrictions being lifted over the summer, but I worry that The Chancellor, Rishi Sunak, has warned of a 'severe recession, the likes of which we haven’t seen' and some
commentators talk about 10% unemployment not just for the short term but for up to 5 years, it’s important to me that we don’t talk ourselves into recession.

We are seeing projects put back and a reduction in the number of enquiries. You may be interested to read that the 'Building Conference'  reported a continued downward trend in both the number and value of contracts awarded in the first two weeks of May.

In the six weeks before the lockdown there was an average of 122 contracts awarded each week. In the first and second weeks of May, there were just 66 and 94 contracts awarded respectively and the value of the contracts awarded fell from an average of £2.08 billion per week to just £0.3 billion in the first week of May and £1.43 billon in the second week of May. These are grim stats but let’s hope this is a more of a holding pattern and the work will flow through soon. This reduction in the pipeline of work is likely to hit the Construction industry at the worst possible time. The Job Retention Scheme is scheduled to end at the end of October just when the industry will need it.

We all have a part to play in an economic bounceback, it’s time to show our metal, that’s resilience, customer and project focus and the brilliant can-do attitude of our sector. A demonstration of our flexibility and versatility which won’t go unrecognised and perhaps optimistically, I hope will act as a catalyst for the kick-start.

To make matters worse the government is looking to introduce reverse charge VAT in March 2021. This unfair change to the tax system will have a massive negative economic impact on the industry and will increase the burden on business and reduce cashflow - not just in
the short-term but as a perpetual effect. BCSA has been lobbying hard against this and is keeping the pressure on by writing to Mr Sunak directly, to urge this initiative gets taken off the table.

Any construction company, but particularly those who purchase high value materials and act as subcontractors in delivering construction services, will in effect become a perpetual creditor to HMRC. They would be caught in the middle of regular input VAT being charged to them, then the reverse charge applying to the sub-contracted construction services they provide. You must then grasp the implication that
any cashflow shortfall must be funded from debt, or elsewhere in an already pressurised business.

BCSA has also written to Mr Nadhim Zahawi the Minister for Business and Industry warning about the fall in the construction pipeline and urging him to proceed as a matter of urgency with the infrastructure projects promised in the budget.

These are perhaps only two of the many priorities and changes that we are facing, add to them what the new norm is going to look like. Some of these are already having positive effects. Personally, I’m finding that using technology for instance, will reduce travel and the expense of it, and the travel time spent doing something else.

Being an eternal optimist, I’m looking forward to finding better ways of working, being efficient and effective and seeing that they impact positively on all our businesses.

Tim Outteridge, BCSA President

British Constructional Steelwork Association
4 Whitehall Court, Westminster, London SW1A 2ES
email: postroom@steelconstruction.org | Tel: 020 7839 8566
BCSA logo Supporting the UK Steelwork Contractors for over a Century
© All Rights Reserved BCSA – The British Constructional Steelwork Association Ltd.

This website uses cookies to improve your user experience. To find out more about the cookies we use, see our privacy policy. I accept