• Contact us
  • Steel Construction Certification Scheme
  • Members Area
  • Login

    Lost your password? Register
BCSA Master LogoBCSA Master LogoBCSA Master LogoBCSA Master Logo
  • About us
    • BCSA Group of Companies
    • Our Team
  • Member Directories
    • Buildings Directory
    • Bridgeworks Register
    • Industry
    • Corporate
    • Benefits of using a BCSA member
    • Sustainability Charter
      • Sustainability Charter Members
    • BIM Charter
      • BIM Charter Members
  • Join BCSA
    • Membership Categories
      • Steelwork Contractor Buildings
      • Steelwork Contractor Bridgeworks
      • Industry
      • Corporate
    • Member Benefits
  • Resources
    • COVID-19
    • Process and Technical
      • Bridges preliminary design
      • Coatings Advisory Service
      • Committees and Working Groups
      • National Structural Steelwork Specification
      • Steel Industry Guidance Notes (SIGNS)
      • Sustainability
        • SteelConstruction.info – Sustainability
        • Steel construction – Carbon Credentials
        • Sustainability Charter
        • Carbon Footprint Tool
        • Bridges Carbon Calculator
      • Steel Construction Building Information Modelling (BIM) Charter
      • Webinars
    • Law and Contracts
      • Annotated Contracts
      • Contractual Handbook
      • Construction Act Amendments
      • Helplines and Other Schemes
      • Insurances
      • Model Letters and Other Documents
      • Minimum Standards of Contract
      • Sub-contract Terms and Conditions
    • Commercial
      • Cost information
      • Daywork rates survey results
      • Economic reports
      • IR35 Off-Payroll Working
      • Prices and Lead Times
      • Reverse VAT
      • State of Trade
    • Health and Safety
      • ‘Be Selfish Be Safe’ Information Sheets
      • Behavioural Based Safety
      • Construction Skills Setting Out Video
      • Electromagnetic Fields
      • Erection Guides
        • BCSA Guides
        • Metal Deck Health and Safety Guides
      • Health and Safety Information
      • Lifting Operations
      • Loading and Unloading Vehicles
      • Mobile Elevating Work Platforms (MEWPs)
      • Office, Factory and Site
      • Personal Protective Equipment (PPE)
      • Risk Assessments
      • Safe Site Handover Certificate
      • Safety Schemes in Procurement (SSIP)
      • About Tool Box Talks
        • Tool Box Talks
      • BCSA CHAS Discount offer
    • Training
      • CRAFT Certificate Introduction to Module Learning
      • CRAFT Structural Steelwork Fabricator Welder
      • CRAFT Metal Decking Installer
      • CRAFT Structural Steel Detailer
      • CRAFT Surface Treatment
      • Bolting Competency
      • Welding Competency
    • Steel for Life
    • Structural Steel Design Awards
      • Award
        • Tintagel Footbridge, Cornwall
        • 52 Lime Street, London
        • The Curragh Racecourse Redevelopment, Kildare
        • Bath Schools of Art and Design
        • A14 Cambridge to Huntingdon Improvement Scheme
        • Brunel Building, London
      • Commendation
        • Mary Elmes Bridge, Cork City
        • The Post Building, London
        • Centre Building, London School of Economics
        • Waterloo Station Roof Infill
        • One Bartholomew, Barts Square, London
        • The Standard Hotel, London
      • Merit
        • The Gravity Bar, Guinness Storehouse, Dublin
        • Scarborough Footbridge, York
      • National Finalists
        • One Bank Street, Canary Wharf
        • Barton Square, intu Trafford Centre, Manchester
        • Boeing GoldCare Aircraft Hangar, Gatwick Airport
        • The Balfour, Kirkwall, Orkney
        • National Infrastructure Laboratory, University of Southampton
        • The Wave, Coventry
        • Drake Circus The Barcode, Plymouth
        • Bridgewater Place Wind Amelioration Scheme, Leeds
      • Judges 2020
      • SSDA 2019
        • Award
          • Wimbledon No.1 Court
          • Taplow Riverside Footbridge
          • Coal Drops Yard, London
          • Tombola HQ, Sunderland
          • Tottenham Hotspur Football Club, New Stadium
        • Commendation
          • Battersea Arts Centre
          • Fen Court, London
          • Chiswick Park Footbridge
          • Ingenuity House, Birmingham
          • Neuron Pod, London
          • Royal Academy of Music, London
        • Merit
          • The Macallan Distillery
          • G W Annenberg Performing Arts Centre
          • Greatham Creek Seal Hide, Middlesbrough
          • Telford Central Footbridges
        • National Finalists
          • 160 Old Street, London
          • Aga Khan Centre, London
          • Ely Southern Bypass
          • Project Mint at The O2
          • Kettner’s Townhouse & Soho House Greek Street
  • Events and Meetings
  • News
  • Shop
  • Members Area
  • Reverse VAT
  • BREXIT
  • COVID-19
  • HS2 Collaboration Hub Webinar
0
  • Home
  • News
  • General
  • President’s Column: April 2021

President’s Column: April 2021

6th April 2021

I’ve been informed by my social media that I’ve been in this industry for 25 years. During that time, a lot of technological advances have been brought into the industry, all with the aim of making our lives a lot easier. In many ways they have, a lot of the design and detailing programs on the market are superb bits of kit. One of the things that hasn’t improved however, is the quality and timeliness of coordinated information that we all have to suffer. During that time, every new technological advance was going to be the cure to poor information flow: the post, the fax, the email, extranets and BIM platforms. Certainly, the information flow has exponentially increased, but alas the quality of that information leaves a lot to be desired. What it means in the final reckoning is a lot of additional pressure put on our designers and detailers, with shortened lead in’s that can only make the probability of errors creeping in more likely, both in the technical and production phases. We all know the number of variations that are caused by this wasteful process, nobody likes doing them, nobody likes to pay for them.

Why is it still happening? In my opinion it’s the procurement process adopted in the UK. Main Contractors just refuse to appoint all the necessary design teams at the appropriate time, such that coordinated information can be accurately modelled. If they didn’t’ feel they needed to squeeze every pound out of the contract and just appointed the right guys on the right job much faster, I think that a lot of the problems we all face would be vastly reduced. I have found BIM to be a great idea, just like Esperanto, but it’s not working at the top end of the industry, that being client to steelwork contractor. Where it is more successful is between steelwork contractors and our sub-trades, such as metal deck, precast and edge protection contractors. Passing our models back through the chain to, say, architects for checking, also seems to work well.

Whilst sat in a sustainability meeting talking with a diverse set of academic thinkers, consulting engineers and steelwork contractors, much of the talk was on “minimum weight” design, the re-use of steel and the recycling of steel. The recycling argument of steel is a “no-brainer”; we should push that message hard. “Minimum weight” design was tried very unsuccessfully 25 years ago. In its worst form its “gravity only” design for the final condition only. Practical designers know only too well the many design and detailing challenges that are caused by inappropriate member design. I also think that with the advent of 3D steel design software, the days of inefficient design by consulting engineers are well gone. If anything, we spend more time in value engineering sessions trying to make changes to the structural system to pay for all the secondary steel left out of the primary design. Re-use in theory can be useful if done correctly and intelligently. There is talk of suggested minimum percentages of re-used steel on future contracts, but it is just not practical yet.

The steelwork industry is one of the most competitive industries you could be involved with. The vast majority of contracts are for bespoke buildings with the steelwork packages being priced at production style wafer thin margins. Working in the steelwork industry can be very frustrating, but it certainly is not dull.

Mark Denham, BCSA President

British Constructional Steelwork Association
4 Whitehall Court, Westminster, London SW1A 2ES
email: postroom@steelconstruction.org | Tel: 020 7839 8566
BCSA logo Supporting the UK Steelwork Contractors for over a Century
© All Rights Reserved BCSA – The British Constructional Steelwork Association Ltd.

This website uses cookies to improve your user experience. To find out more about the cookies we use, see our privacy policy. I accept